Roof Complete For 3Ph Memu/Tc6 Coaches As Per Drg.No : 747-1-6-005 Alt 'Nil' N Ote: Drawing Number: Aaa51072 To Be Read As Mvmc15013 Alt. Nil. The Firm Shall Fulfil The Requireme Nt As Per Icf/Md/Specn. 200, Issue Status-01, Rev. 04 With Amendment No. 01, Revised Appended N Ote For Stainless Steel Roof Assembly Dated: 17.03.2025. Special Condition: 1) Packing Instruction: Mcf Pi030- D Ver. 0. 2) Dpt (Dye Penetration Test) Of Roof Complete To Be Performed At Firm'S Premise By T Pi. 3) Firm Shall Confirm And Obtain The Exact Drawings To Be Followed From Mcf/Raebareli Before Start Of Manufacturing. [Safety Item] [ Warranty Period: 84 Months After The Date Of Delivery ] ]