"(1) Ctr(S), Deep Screening, Construction Of Drain, Crossover Correction & Realignment Of Non Design Curve In Yards Under Sse/Pway/Gondia Section. (2) Left Over P.Way Works Between G-Gj Section (3Rd Line) In The Jurisdiction Of Aden/Gondia. (3) Left Over P.Way Works Between G-Ror Section (3Rd Line) In The Jurisdiction Of Aden/Gondia."