Technical Study Following: - Construction Of The Track Connecting Rr203 At The Level Of Douar Tasgua Ouguerd And Douar Ouilzane Over A Length Of 8 Km. - Drinking Water Supply From Douar Igui Mhand And Tidli From Ouacheghnouchte Wells (EXPIRED)